Follow Us on Facebook

Notice Board

Buckland Brewer Parish Council
Request for Quotations (RFQ)
Provision and Installation of Play and Sports Equipment

1. Contracting Authority

Buckland Brewer Parish Council
Locum Parish Clerk: Jane Mills
17 Lenwood Country Club
Lenwood Rd
Northam
Devon
EX39 3PN

2. Advertisement & Timetable

This Request for Quotations will be advertised via Find a Tender  from 9th February 2026.

Closing date for receipt of quotations:  Noon on 5th March 2026.

3. Description of the Requirement

Buckland Brewer Parish Council invites suitably experienced contractors to submit quotations for the supply, removal, installation, and associated groundworks for play and sports equipment at the Playing Field and Amenity Field.

4. Scope of Works – Playing Field

– Removal of existing swing set (7 years and under)
– Supply and installation of replacement non-wooden swing set
– Repair and making good of wetpour surfacing
– Supply and installation of zip wire (location to be confirmed)
– Supply and installation of climbing frame (Pirlu or equivalent) on wetpour
– Supply and installation of Youth Shelter

5. Scope of Works – Amenity Field

– Creation of new gated entrance
– Construction of accessible path
– Supply and installation of accessible roundabout
– Supply and installation of accessible swing
– Supply and installation of older children’s swing
– Supply and installation of younger children’s swing
– All equipment installed on wetpour surfacing
– Supply and installation of Youth Shelter
– Supply and installation of two full-size goal posts

6. Standards & Compliance

All works must comply with BS EN 1176, BS EN 1177, RoSPA guidance, the Health & Safety at Work Act 1974, and the Construction (Design and Management) Regulations 2015.

7. Health, Safety & Insurance

Contractors must provide site-specific Risk Assessments and Method Statements (RAMS) and evidence of the following minimum insurance levels:

– Public Liability Insurance: £5 million
– Employers’ Liability Insurance

8. Site Visits

Contractors are encouraged to undertake a site visit prior to submitting a quotation. Visits can be arranged by contacting the Parish Clerk.

9. Quotation Requirements

Quotations must include:
– A detailed cost breakdown by site and item
– Equipment specifications
– Programme and proposed timescales
– Details of warranties and guarantees
– Confirmation of aftercare and maintenance
– Quotation validity period of not less than 30 days

All prices must be inclusive of labour, materials, plant, delivery, and disposal.

10. Pricing Return Schedule

Item / Location Description Price (£)
Playing Field – Swings & Surfacing As per specification
Playing Field – Zip Wire As per specification
Playing Field – Climbing Frame As per specification
Playing Field – Youth Shelter As per specification
Amenity Field – Access Works As per specification
Amenity Field – Play Equipment As per specification
Amenity Field – Youth Shelter As per specification
Amenity Field – Goal Posts As per specification

11. Evaluation Criteria

Quotations will be evaluated on the basis of price, compliance with the specification, quality and durability of equipment, contractor experience, and ability to meet timescales. The Parish Council does not undertake to accept the lowest or any quotation.

12. Submission Details

Quotations must be received no later than Noon on 5th March 2026.

Submissions should be sent by email or sealed envelope to:

Jane Mills
Locum Parish Clerk
Buckland Brewer Parish Council
17 Lenwood Country Club
Lenwood Rd
Northam
Devon
EX39 3PN

13. Additional Information

Buckland Brewer Parish Council reserves the right to amend the specification, seek clarification, or not to award a contract. This RFQ does not constitute a commitment to award a contract.

14. Procurement Documents

The following documents form part of this procurement process and must be reviewed prior to submission:

– Request for Quotations (RFQ)
– Technical specifications and scope of works
– Pricing Return Schedule
– Contractor Risk Assessments and Method Statements (RAMS)
– Evidence of Insurance
– Equality and Health & Safety policies (upon request)

By submitting a quotation, contractors confirm they have read and understood all procurement documents and can meet the stated requirements.

Skip to content